Danaos

Driving Efficiency in Shipbuilding & Repair with ProjectVIEW ERP

Cost control

From BoQ to Baseline: Automating Cost, Schedule & Client Collaboration

 

In the demanding world of Shipbuilding and Repair (SBR), efficiency is not optional. In fact, it’s the difference between profit and loss, on-time delivery or delay, transparency or chaos.

 

At DANAOS Projects Software Solutions LLC , we recognize the specialized challenges of shipyards. Therefore, we have tailored our ProjectVIEW ERP platform to support every stage of the SBR lifecycle, from client inquiry to execution, billing, and real-time reporting.

 

Shipbuilding & repair

From Client BoQ to Shipyard Job List — Precision from Day One

 

As a shipyard owner or manager, your project begins with a client’s BoQ (Bill of Quantities). This is a detailed scope of required works and expectations. ProjectVIEW ERP then enables you to:

 

  • Import or register BoQ items directly into the system.
  • Create your internal Job List: first inspect the vessel, then map real-world job needs to each BoQ line item.
  • Define job scopes clearly and assign the required resources (labor, materials, subcontractors, equipment) based on actual inspection findings.

 

As a result, you get an accurate, resource-based cost model. It forms the basis of your budget and proposal, all traceable and structured in the system.

 

Shipbuilding & repair

Generate a Transparent & Realistic Client Proposal

 

Once your team has defined and budgeted the internal jobs:

 

  • ProjectVIEW ERP links each job to its corresponding BoQ item, ensuring clarity and traceability.
  • You build pricing bottom-up: from resource costs, margins, overheads, and more.
  • Finally, the system automatically generates a formal, itemized proposal that is accurate, auditable, and defensible.

 

This eliminates ambiguity. As a result, you can negotiate confidently with the shipowner, backed by real data.

 

Integration

Connect Cost with Time: WBS & Scheduling Integration

 

In ship repair, time is money, literally. For this reason, ProjectVIEW ERP integrates seamlessly with MS Project to:

 

  • Associate each Job List item with the relevant WBS (Work Breakdown Structure) activity.
  • Create a realistic schedule of works, anchored to resource availability and job durations.
  • Establish a time-phased budget baseline, blending cost and schedule into one project control model.

 

In short, this is your master baseline: the reference point for execution, tracking, and reporting.

 


 

Cost control

Monitor Actuals Daily: Cost, Progress & Resource Consumption

 

Once execution begins, ProjectVIEW ERP shifts into control mode:

 

  • Team leaders or supervisors log daily job progress using easy mobile/desktop forms.
  • They also record resource usage (hours, materials, rentals, etc.) in real-time.
  • The system constantly compares actual vs. planned:

 

As a result, the system creates early warnings, keeps budgets in check, and supports proactive decision-making.

 

Shipbuilding & repair

Real-Time Client Portal: Visibility & Trust

 

Your client (the shipowner) can access a dedicated portal, allowing them to:

 

  • View real-time progress reports and dashboards
  • Review and approve scope changes or extras
  • Track their project’s cost and timeline — as it evolves

 

In this way, your client relationship moves from reactive to collaborative, backed by transparency and trust.

 

Shipbuilding & repair

Used by All Stakeholders — Not Just Project Managers

 

ProjectVIEW ERP is more than a project control system. Instead, it’s a collaboration backbone for the entire SBR value chain:

 

  • Project managers track cost and schedule
  • Supervisors input progress on site
  • Procurement gets real-time material needs
  • Finance tracks commitments and billing
  • Clients stay informed and engaged

 

Thus, this cross-functional integration ensures that everyone is working from the same source of truth. There are no silos, no double data entry and no surprises.

 

Shipbuilding & repair

Conclusion: ERP Built for SBR, Not Adapted to It

 

At DANAOS Projects, we didn’t retrofit a generic ERP to shipyards. Instead, we engineered ProjectVIEW ERP with ship repair and construction in mind. SBR professionals already trust it to:

 

  • Convert client BoQs into controlled job plans
  • Align budget and schedule
  • Manage execution in real time
  • Deliver projects faster, leaner, and more transparently

 

So, whether you’re building a new vessel or repairing a fleet, ProjectVIEW ERP is your digital dockyard: powerful, purpose-built, and trusted.

Related: Shipyard Management Software & Shipbuilding ERP · Ship Repair Management Software · Naval Shipbuilding ERP

Christos Emmanouilidis

About the author

Eng. Christos Emmanouilidis

Chief Customer & Commercial Officer, DANAOS Projects

Eng. Christos Emmanouilidis is Chief Customer & Commercial Officer at DANAOS Projects and a subject-matter expert in construction cost control, industry-specific ERP and the digital transformation of project-based enterprises. A Civil Engineer with more than 25 years of international experience in engineering, construction management, quality and commercial strategy, he leads the global market development of ProjectVIEW ERP for construction, infrastructure,…

Search or Ask AI