Danaos

Mining & Quarrying Agentic ERP

Connect mine development costs, contracts and operations

End-to-End ERP + AI for Mining and Quarrying

Mining runs like a construction-grade project, with nonstop extraction cycles, volatile OPEX and a complex supply chain. ProjectVIEW ERP controls every commercial, operational and financial process in one system. As a result, you run each mine and quarry efficiently and profitably.

ProjectVIEW AI is fully available in ProjectVIEW v12. It includes the ProjectVIEW AI Assistant, the MCP connector and specialized AI agents. These agents send risk alerts and propose actions, while your team keeps approval authority.

Mining And Quarrying
Mining & quarrying

Explore mining sectors

Choose the sector that matches your operation.

Mining & quarrying

Take Control of your Mining And Quarrying Operations

ProjectVIEW ERP helps mining and quarrying contractors and mine and quarry owners plan resources, control costs and manage productivity. It is a purpose-built ERP for mining and extraction. As a result, both sides work from one set of project data and protect their margins. With ProjectVIEW ERP, teams can:

  • Dynamically plan resources based on daily work orders
  • Track labor productivity, machinery utilization, and material consumption against baselines
  • Manage preventive and corrective maintenance for maximum equipment availability
  • Monitor subcontractors, vendors, and suppliers in real time
  • Improve forecasting accuracy to reduce overruns and increase profitability
Mining & quarrying

Heavy Machinery and Labor Allocation

ProjectVIEW ERP goes beyond basic scheduling by integrating heavy machinery and workforce management into a single platform. It optimizes equipment usage and labor allocation based on maintenance schedules, operator availability, and production requirements—helping mining companies achieve higher output with lower costs.

By connecting with SCADA, PLC, and fleet telemetry systems, ProjectVIEW ERP delivers real-time visibility into site operations, enabling accurate forecasting, reduced downtime, and cost control for safe and profitable mining projects.

Mining & quarrying

Why Mining and Quarrying Contractors Choose ProjectVIEW

Heavy Machinery Maintenance

Manage excavation, earthmoving, drilling, and transportation machinery health, trigger predictive maintenance, optimize scheduling, improve equipment life cycles, and enhance operational efficiency.

Sustainability and Energy Management

Optimizing process execution, equipment operations, and integrating data from environmental sensors, system enables mining contractors to track, analyze, and optimize energy consumption.

Production Optimization

Track and align available storage capacity and stockpile levels, providing insights into when production should be adjusted to prevent overstocking. Optimize production to match storage capacity and minimize bottlenecks.

Cost control

Resource and Material Use That Reflect True Cost and Progress

  • Site Item Request (SIR)
  • Examine Materials Production/Availability
  • Track Materials per Location
  • Monitor Production/Fabrication
  • Inventory Management – Store Issue Voucher (SIV)
  • Materials Allocations/Approvals
  • Machineries Maintenance – Garage
  • Vessels’ Drydocking
  • Machineries – Assets – Tools Planning
  • Machineries – Operators Requests
  • Fleet Management
  • Tools and Fittings Requests
  • Labor Planning and levelling
  • Biometrics integration (In/Out)
  • Labor Work Orders / Timekeeping
  • Employee Daily Transactions – Payroll
  • Subcontractor packages
  • Subcontractors Progress inspection
  • Monitor Subcontractoes Resources
  • Deductions/Retentions
  • New BoQ/WBS
  • Connected Documents/Dwgs
  • Daily Site Progress (% or Qty )/BoQ/WBS
  • Request for inspection (RFI)
mining erp software process diagram with ProjectVIEW ERP 01 02 03 04 05 06
FAQ

Frequently asked questions

What is Mining ERP software?

Mining ERP software is an enterprise business platform built for the mining and quarrying industry. It integrates operations, equipment maintenance, supply chain, finance, and workforce management into one system—helping mining contractors optimize production and control costs, while enabling owners to monitor progress and performance in real time.

Why should mining companies use ERP systems?

ERP systems help mining companies streamline business operations, optimize production, and mitigate risk. They provide real-time visibility into equipment performance, labor productivity, and production data, reducing downtime, improving safety, and preventing costly disruptions.

What are the advantages of mining ERP software?

The main advantages are:
• Dynamic planning of resources and assets, aligned with availability and production requirements
• Preventive Corrective and predictive heavy equipment maintenance
• Centralized procurement and materials management
• Improved energy and sustainability tracking
• Real-time production monitoring and reporting
• Multi-site and multi-country scalability

How to choose the best ERP for mining operations?

The best mining ERP is one that is purpose-built for the mining and quarrying industry, incorporating project-based production, construction, and site operations. It should be able to handle heavy equipment management, stockpile optimization, and ESG compliance, while integrating seamlessly with existing corporate systems and enabling mining enterprises to operate with greater confidence and control.

Why do mining companies choose ProjectVIEW ERP?

ProjectVIEW ERP is a project-based enterprise platform for the mining lifecycle, from mine development to processing and logistics. It puts project-based production at the center of operations and integrates schedules, costs and processes. With equipment tracking, production planning and QHSE records management, it helps mining companies reduce costs, improve productivity and keep control.

Search or Ask AI