Explore manufacturing sectors
Choose the sector that matches your operation.
Project-Based Steel & Metal Fabrication
Discover how ProjectVIEW ERP, the project-based steel and metal fabrication ERP software can streamline your manufacturing process.
Offsite Construction & Modular Systems
Explore offsite construction and modular systems ERP software for efficient factory-based fabrication of building elements.

Manufacturing ERP for efficient project control
ProjectVIEW ERP helps manufacturers and fabricators deliver to specification across EPC and PPP programs. At the same time, project owners and OEMs get clear visibility of progress, quality and cost. As a result, planners and plant teams coordinate people, machines and materials, and every lot stays traceable. With ProjectVIEW ERP, teams can:
-
See live production status, unit costs, and earned value as jobs move across stations.
-
Convert quotations faster by auto-deriving routings and materials directly from client BoQ.
-
Grow margins with capacity insights, line balancing, and make-or-buy comparisons.
-
Forecast demand and inventory precisely to avoid change-driven delays and rework.
Why Project-based Manufacturers Choose ProjectVIEW
Resource and Production Use That Reflect True Cost and Progress
From raw material consumption to fabrication output, machinery utilization, operator productivity, and subcontracted processes, ProjectVIEW ERP ensures every manufacturing step is tracked and optimized.
- Track materials, monitor production, and manage inventory.
- Plan and maintain machinery and tools.
- Record labor activities, timekeeping, and payroll.
- Inspect subcontractor progress and manage approvals.
- Monitor daily site progress with connected documents.
- Machineries Maintenance – Garage
- Machineries – Assets – Tools Planning
- Machineries – Operators Requests
- Tools and Fittings Requests
- Labor Planning and levelling
- Biometrics integration (In/Out)
- Labor Work Orders / Timekeeping
- Employee Daily Transactions – Payroll
- Contracts or POs are created directly in the ERP.
- Terms include specs, drawings, tolerances, and delivery schedules.
- Deductions/Retentions
- Automated BOM Creation
- Resource & Cost Allocation
- BOM/WBS
- Versioning & Change Control
- Certification Receivables
- Contract Receivables
01
02
03
04
05
06
Frequently asked questions
What is project-based manufacturing ERP, and how does it turn a BoQ into a bill of materials?
Project-based manufacturing ERP connects what the contract requires, what the factory must make and what the site must install. Structural steel, precast elements, prefabricated slabs and ship steel plates are made to each project’s quantities, dimensions and specifications, in line with its assembly and erection sequence.
The bill of quantities (BoQ) defines the scope to deliver and measure. The bill of materials (BoM) breaks that scope down into the parts, materials and quantities needed for fabrication. One BoQ item can cover several distinct assemblies, each with its own BoM. The link lets teams trace each part back to the contract scope.
For a BoQ item covering fabrication and erection of 40 tonnes of structural steel, engineering identifies the columns, beams and bracing assemblies. Each assembly’s BoM lists the sections, connection plates and fasteners. Procurement orders the materials, the workshop tracks fabrication and inspection, and the site team sees which assemblies are ready for erection. Project controls can compare material consumption and fabrication costs with the BoQ budget.
If a connection plate changes after steel has been ordered or cut, the team can identify affected BoM components, check what can still be used and assess the cost and erection sequence before approving the revision.
Why do manufacturers need ERP systems for project-based production?
Unlike traditional process manufacturing, project-based production must align with client BoQs, WBS structures, and cost codes. ERP systems give manufacturers real-time visibility into production status, unit costs, and earned value, enabling accurate resource allocation, tighter cost control, and faster response to change-driven demands.
What are the benefits of Project-based Manufacturing ERP software?
The main benefits include:
• BoQ-to-BOM intelligence for accurate costing and revenue recognition
• Machine and crew scheduling to avoid bottlenecks
• Telematics, SCADA and utilization logs to optimize capacity
• Integrated procurement of raw materials, consumables, and spares
• Embedded quality and compliance with full revision and audit trails
How does Project-based Manufacturing ERP improve production efficiency?
It improves efficiency by linking machines, tools, and crews to each production phase, from cutting and welding to curing, assembly, and QA. With calendar and Gantt scheduling (P6/MS Project integration), manufacturers can balance line capacity, re-sequence work, and monitor OEE-style utilization—ensuring smoother production with fewer delays.
Why do project-based manufacturers choose ProjectVIEW ERP?
ProjectVIEW ERP is purpose-built for construction-driven manufacturing environments, covering steel fabrication, precast concrete, and MEP production. By connecting BIM objects, BoQs, WBS, and cost codes, it keeps every manufactured unit tied to its originating project, activity, and budget line. With fast deployment and cloud or on-premises flexibility, it enables manufacturers to operate with confidence, reduce costs, and grow margins
How do we control costs when a fabrication design changes?
ProjectVIEW ERP tracks parts through successive production phases, with the output of one phase feeding the next. Trace a design change through the bill of materials (BoM) and check which phases are complete. If a connection plate changes after cutting but before drilling, compare reuse, rework and replacement before approving the extra cost and time.
Each phase records materials consumed, labour, machinery and tools, subcontracted work and production time. Compare phase costs and productivity rates, then roll the costs up to the finished element and its bill of quantities (BoQ) item to assess the effect on the budget, delivery and erection sequence.
How do we track fabrication progress and cost by work package?
Track parts and assemblies through cutting, welding, inspection and release for delivery. ProjectVIEW ERP compares planned and actual output, production time and resource use by phase. If 12 beams are completed on schedule but use more welding hours than planned, the milestone is on track while welding productivity falls and cost rises.
For automated yards, ProjectVIEW ERP can integrate with SCADA. Map available signals such as output counts and cycle times to the relevant phases, then use those readings alongside material, labour, equipment and subcontract records to measure productivity and roll actual costs up to the assembly and BoQ item.
How do we check material readiness before releasing a fabrication package?
Use the approved BoM quantities to check usable stock and open purchase orders. Compare expected receipts with the WBS deadline for each phase. If connection plates will arrive after welding must begin, identify which cutting and preparation can proceed and which assemblies must wait.
How do we plan shop capacity across several projects?
Use quantities from the BoQ or BoM to determine the materials, labour, machinery and hours each fabrication phase needs. Use WBS durations and deadlines to compare demand across jobs. If two packages need the same drilling machine in one shift, check which work can move without delaying inspection, dispatch or erection.
How do we plan fabrication and delivery from the BoQ, BoM and WBS?
The BoQ defines contract scope, and the BoM breaks it into individual elements and fabrication quantities. Linking both to the WBS lets planners allocate resources to those quantities and work back from the duration and deadline of each installation activity to set fabrication, inspection and delivery dates for each element. If plates arrive late, identify the affected assemblies and check whether resequencing can protect the erection deadline.

