Risk management
Eliminating the Guesswork in Estimation, Budgeting, and Cost Control
Capital projects rely primarily on BoQ quantities for costing. Estimating a project’s cost budget is a BoQ-based exercise that requires engineering knowledge, local experience, and project ingenuity while incorporating the element of Risk (the unknown).
To minimize risk and establish a realistic budget, allocating direct and indirect resources is essential.
Risk mitigation and control are achieved by recognizing the “known knowns”, the “known unknowns”, and speculating on the “unknown unknowns”.
Risk management
Risk controls by system
| Category | Scheduling Apps | Estimation Tools | ProjectVIEW ERP |
|---|---|---|---|
| Known knowns | |||
| Quantity verification from BoQs, cross-checked with drawings/BIM (QTO) | Not supported |
Fully supported |
Fully supported |
| Interpretation of direct resources (materials, labor, machinery, subcontractors) and indirect resources | Fully interpreted From relative BoQs and applied on each WBS (effort-driven) |
Fully supported |
Fully supported |
| Known Unknowns | |||
| Assembly (synthesis) of resources required for each BoQ (Type Allocation) | Not supported |
Partially supported Lacks site apps and optimized Cost Recipes/Productivity Templates (lessons learned) |
Fully supported |
| Quantity of each resource type required to construct each BoQ (Quantity Allocation) | Not supported |
Partially supported Lacks site apps and optimized Cost Recipes/Productivity Templates (lessons learned) |
Fully supported |
| Updated/forecasted cost of resources for each BoQ (materials, payroll, etc.) | Not supported |
Not supported Lacks integrated site applications. No connection between labor/plant/subcontractor usage and BoQ/WBS for accurate calculations. |
Fully supported |
| Estimated execution duration for each BoQ (based on labor productivity, machinery utilization, material sourcing, and subcontractor availability) | Partially supported Mainly scheduled based on constraints and deadlines from the Critical Path |
Not supported Lacks integrated site applications. No connection between labor/plant/subcontractor usage and BoQ/WBS for accurate calculations. |
Fully supported |
| Availability of resources at the time BoQs need to be constructed (resource leveling) | Partially supported WBS-Estimated Resource Leveling |
Not supported |
Fully supported |
| Unknown Unknowns | |||
| Change Management: Register and control variations and new design requirements | Not supported |
Not supported |
Fully supported |
Risk management
Cost Management
ProjectVIEW ERP minimizes budget risk by increasing the number of “known” constants while constraining the “unknown” variables alleviating uncertainty and underdeterminacy during Cost Estimation.
It extrapolates complex relationships between Cost, Time, and Risk by reducing assumptions and removing ambiguity to create realistic budgets and maintain updated versioning between Cost Control and Scheduling Progress baselines.

Risk management
Managing Risk in Project Budgeting

Frequently asked questions
What is cost risk management in capital projects?
It is the process of finding, sizing and controlling the events that can push cost above budget: quantity errors, price changes, low productivity, scope changes, delays and subcontractor failure.
How does ProjectVIEW ERP detect cost overruns early?
It compares budget, commitments, actual cost and forecast for each BoQ item and WBS activity. Earned value indicators (CPI and SPI) and cost-to-complete show which items drift, before the final account.
How does ProjectVIEW ERP control variations and claims?
Each variation or claim is priced against the BoQ and WBS before approval, and is tracked through client approval and certification.
Does ProjectVIEW ERP manage risk in shipbuilding and ship repair?
Yes. Newbuild, repair and conversion projects are controlled with the same BoQ, WBS and cost code structure. Papilas Shipyard uses DANAOS Vortex, our asset and maintenance suite.

Risk management
ProjectVIEW ERP’s Risk Management
Risk management considerations include defining the Risk domains (Operations, Quality, Environment, Safety, Resources, and Plant), setting Probability and Possibility accordingly, and assessing Severity, Impact, and estimated cost. Our analyzer will assist you in calculating the Cost of Mitigation based on suggested Mitigation Actions and comparing the Cost of Risk with the Cost of Mitigation using a Cost-Benefit Analysis. Calculations are based on nonlinear regression analysis.