What does a production and fabrication manager do in a project-based company?
A production and fabrication manager turns project demand into fabricated components, both on time and at the planned cost. In ProjectVIEW ERP, each production order is linked to the BoQ or BoM item as well as the WBS activity and the cost code. It is also linked to the design data it comes from. Capacity, material and cost per component are therefore visible before production starts. It works in the same way for steel and precast yards, hull blocks, offshore modules, mining structures and engineer-to-order products.
- Plan production: schedule production per project, based on design data as well as capacity.
- Supply: then trigger material and subcontract demand just in time.
- Control: finally, track fabrication progress and cost against the project budget.
How ProjectVIEW ERP supports production and fabrication managers
Industries
Select your industry
ConstructionSteel structures, precast and rebar fabrication for site delivery.
Shipbuilding & repairHull block fabrication, pipe spools and outfitting modules.
Marine & offshoreOffshore modules, jackets, spools and subsea structures.
Mining & quarryingPlant structures, chutes and wear components.
Project-based manufacturingEngineer-to-order products with BoM, routings and shop hours.Connected platform
Your ProjectVIEW stack
ERP modules
AI agents
These specialized AI agents are available with ProjectVIEW v12. They work on governed ERP data, send risk alerts and propose actions. Your team approves every action. ProjectVIEW AI v12
Services
FAQ
FAQ: Production & Fabrication Manager
Talk to our expert
Questions about your role or your industry? Talk to a subject-matter expert who implements ProjectVIEW ERP.
Which design tools does ProjectVIEW ERP integrate with?
Tekla, StruSoft, Statica, SolidWorks and more, so production plans start from design quantities.
How do I track fabrication progress and cost?
Progress and cost are recorded per production order and component, and then compared with the project budget and schedule.
How do BoM and routings link to project cost?
Each BoM line and routing step is linked to the WBS activity and the cost code, so production cost rolls up to the project.
Does it support offsite and modular manufacturing?
Yes, the Materials & Production Management module covers prefabrication as well as modular or offsite manufacturing (OSM).
Which industries does this cover?
Construction, shipbuilding and repair, marine and offshore, mining and quarrying, as well as project-based manufacturing. The same production planning logic also applies in each, whether the scope is a BoQ, a BoM or a work package.
Defence & Space Manufacturing ERP: Why Project-Based Manufacturing Starts with BoQ-to-BoMConstruction Production Rate vs. Productivity: How Labor and Machinery Drive Cost, Schedule and VariationsThe Connected Shipyard: How Shipyard ERP Creates One Digital Operating System for Every Stakeholder

