What does a materials manager do in a project-based company?
A materials manager makes sure the right material reaches the work on time and at the planned cost, while avoiding waste. In ProjectVIEW ERP, every material requirement and request is linked to the BoQ or BoM item, the WBS activity and the cost code, and so is every order, receipt and issue. Demand, stock and consumption per work package are therefore visible in one place. It works for concrete and rebar, steel plates and outfitting items, subsea spares, fuel and explosives, as well as raw material per BoM.
- Plan demand: forecast material needs per item and need date, so supply can be planned.
- Supply: then request, order and receive material on time.
- Control use: finally, compare issued and consumed material with the budget, and find waste.
How ProjectVIEW ERP supports materials managers
Select your industry
ConstructionConcrete, rebar, MEP equipment and site item requests.
Shipbuilding & repairSteel plates, profiles, outfitting equipment and owner-supplied items.
Marine & offshoreSubsea equipment, consumables and spares for vessels and offshore bases.
Mining & quarryingFuel, explosives, tires, wear parts and consumables per tonne.
Project-based manufacturingRaw material per BoM, bought-out components and work in progress.Your ProjectVIEW stack
ERP modules
AI agents
These specialized AI agents are available with ProjectVIEW v12. They work on governed ERP data, send risk alerts and propose actions. Your team approves every action. ProjectVIEW AI v12
Three ways to start: connect ProjectVIEW ERP to your current ERP, start with the modules you need most, or run the complete ERP + AI system. See integration with SAP, Oracle and other ERPs.
FAQ: Materials Manager / Controller
Talk to our expert
Questions about your role or your industry? Talk to a subject-matter expert who implements ProjectVIEW ERP.
How do I track material use against the BoQ or BoM?
Each issue and consumption is coded to the item and the activity, so actual use is compared with the quantity in the budget.
How do I find waste and over-issue?
When issued quantities exceed the budget per item, they are flagged in reports, per project and work package.
How do I plan long-lead materials?
Need dates from the WBS and supplier lead times give the order date, so procurement starts in time.
Can material move between projects?
Yes, transfers between projects and warehouses are recorded together with a cost adjustment.
Which industries does this cover?
Construction, shipbuilding and repair, marine and offshore, mining and quarrying, as well as project-based manufacturing. The same material control logic also applies in each, whether the scope is a BoQ, a BoM or a work package.