What does a plant, fleet and equipment manager do in a project-based company?
A plant, fleet and equipment manager keeps machines available and productive, while staying within budget on every project. In ProjectVIEW ERP each machine is linked to BoQ or BoM items, WBS activities and cost codes, from the estimate until execution. Utilization, maintenance and cost per machine and per work item are therefore visible in one place. It works for site plant, yard cranes, vessels and spreads, mining fleets as well as shop machinery.
- Allocate: select, buy or hire machines, and assign them to projects when work needs them.
- Maintain: then plan preventive, predictive and corrective maintenance around the schedule.
- Control cost: finally, report utilization, fuel, operators, maintenance and depreciation per machine and per item.
How ProjectVIEW ERP supports plant, fleet and equipment managers
Industries
Select your industry
ConstructionExcavators, cranes and trucks across sites, owned or hired.
Shipbuilding & repairYard cranes, transporters and dry-dock equipment.
Marine & offshoreVessels, spreads and installation equipment per campaign.
Mining & quarryingHaul trucks, loaders, drills and fleet hours per tonne.
Project-based manufacturingShop machinery and lifting equipment per production order.Connected platform
Your ProjectVIEW stack
ERP modules
AI agents
These specialized AI agents are available with ProjectVIEW v12. They work on governed ERP data, send risk alerts and propose actions. Your team approves every action. ProjectVIEW AI v12
FAQ
Frequently asked questions
Talk to our expert
Questions about your role or your industry? Talk to a subject-matter expert who implements ProjectVIEW ERP.
What does a plant, fleet and equipment manager do?
They select, buy or hire and allocate equipment, and also manage maintenance and control spares. In addition, they report utilization and cost, so equipment cost stays within the project budget.
How do you calculate equipment cost per BoQ or BoM item?
To begin with, daily machine use is linked to the item. Then fuel, lubricants, operator, maintenance and depreciation cost are applied to those hours and posted to the item and the cost code.
What is a machinery usability index?
A live measure of how much each machine is used during execution, so idle machines are found before they consume the budget.
Which maintenance types are supported?
Preventive, predictive and corrective maintenance are supported, together with work orders, spares and a history per machine.
Which industries does this cover?
Construction, shipbuilding and repair, marine and offshore, mining and quarrying, as well as project-based manufacturing. The same equipment control logic also applies in each, whether the scope is a BoQ, a BoM or a work package.
Orchestrating Vessels, Replacements, Operators, and Maintenance as One Project SystemConstruction Production Rate vs. Productivity: How Labor and Machinery Drive Cost, Schedule and VariationsMining ERP for Mine Development & Expansion: What Contractors Need in 2026