Danaos

Construction Agentic ERP

Connected workflows for construction project delivery

Agentic ERP for Cost Control in Construction Projects

ProjectVIEW ERP is an integrated construction ERP that controls cost, time and risk from bid to handover. It is the only ERP that links BoQ, WBS and Cost Codes, so site and office work from one set of data.

ProjectVIEW AI is fully available in ProjectVIEW v12. It includes the ProjectVIEW AI Assistant, the MCP connector and specialized AI agents. These agents send risk alerts and propose actions, while your team keeps approval authority.

Construction Project Management ERP for efficient project control on active building site
Construction

Explore construction sectors

Choose the sector that matches your operation.

Construction Project Management ERP software supporting site engineers with real-time project data and planning tools
Construction

Take Control of your Construction Projects

ProjectVIEW ERP helps owners and developers, contractors and consultants control risk in major EPC and PPP projects. It covers infrastructure, buildings, energy, MEP and data centers. As a result, every stakeholder works from one source of truth, with full cost control, transparency and visibility. In turn, teams decide faster and deliver successful projects.

  • Gain real-time awareness of project status and financial health.

  • Make contracting faster to avoid delays and overruns.

  • Expand opportunities with data-driven insights.

  • Cut uncertainty and secure profits through accurate forecasting.

Construction

Unified Construction Operating System

ProjectVIEW ERP acts as a Construction Operating System (Construction_OS) covering estimation, bidding, procurement, and onsite execution, with Physical Asset Management (PAM) built in. It links projects, costs, and physical assets—equipment, plant, and permanent works—across their full lifecycle, ensuring decisions are based on real asset availability and performance, not assumptions.

With 10+1 integrated modules, it unifies commercial, operational, and financial data. By connecting with Oracle P6, MS Project, and BIM, ProjectVIEW ERP eliminates spreadsheet chaos and creates a single source of truth.

Project managers using construction Project Management ERP for progress tracking and cost control on site
Construction

Why Owners, Contractors and Consultants Choose ProjectVIEW

Fast Deployment

Out-of-the-box and ready for cloud or on-premise use, ProjectVIEW ERP typically goes live in 5 to 7 months. It integrates seamlessly with existing business systems, with setup guided by experienced industry experts.

Construction-Specific Features

Onsite and offline-capable apps capture real-time construction data, track material usage, measure labor productivity, and monitor equipment performance. Built for tough jobsite conditions, these tools keep projects moving without delays.

Trilateral Connectivity

Connect BoQ, WBS, and Cost Codes for precise process control and accurate reporting. This integrated structure improves clarity, accountability, and decision-making across the project lifecycle.

ESG Compliance

Meet Environmental, Social, and Governance (ESG) requirements with built-in compliance tools. Ensure your construction projects align with modern sustainability and green standards.

BIM-Driven Efficiency

Integrate BIM and WBS for accurate digital twin models, streamlined procurement, and efficient MEP and data center project delivery. Workflows update automatically with design changes, improving coordination and reducing errors.

Cost control

Resource and Material Use That Reflect True Cost and Progress

From materials consumption to machinery use, labor productivity, and subcontractor performance, ProjectVIEW ERP keeps every detail under control:

  • Track materials, monitor production, and manage inventory.
  • Plan and maintain machinery and tools.
  • Record labor activities, timekeeping, and payroll.
  • Inspect subcontractor progress and manage approvals.
  • Monitor daily site progress with connected documents.
  • Machineries Maintenance – Garage
  • Machineries – Assets – Tools Planning
  • Machineries – Operators Requests
  • Tools and Fittings Requests
  • Labor Planning and levelling
  • Biometrics integration (In/Out)
  • Labor Work Orders / Timekeeping
  • Employee Daily Transactions – Payroll
  • Subcontractor packages
  • Subcontractors Progress inspection
  • Monitor Subcontractoes Resources
  • Deductions/Retentions
  • New BoQ/WBS
  • Connected Documents/Dwgs
  • Daily Site Progress (% or Qty )/BoQ/WBS
  • Request for inspection (RFI)
Construction ERP process diagram with ProjectVIEW ERP 01 02 03 04 05 06
FAQ

Frequently asked questions

What is construction ERP, and what does it cover?

Construction ERP connects estimating, procurement, subcontracts, site progress, cost control, HR, payroll and accounting across projects, joint ventures and subsidiaries, from tender to final account.

ProjectVIEW ERP works as a system of systems. Its modules use the bill of quantities (BoQ), work breakdown structure (WBS) and cost codes to connect site quantities, purchase commitments, payroll and ledger entries in one source of truth. Specialised ProjectVIEW AI agents use those records to automate tasks such as preparing estimates. Authorised teams can also query the data through compatible assistants such as ChatGPT via the Model Context Protocol (MCP), within their configured permissions.

Why should contractors use construction ERP?

Contractors should use construction ERP because it enhances productivity, reduces delays, and centralizes project data for better decision-making. It also improves communication between site and office, ensuring projects are delivered with accuracy and efficiency.

What are the advantages of using construction ERP software?

The advantages include:
• Real-time cost control and project progress tracking
• BoQ-based budgeting for accurate financial planning
• Cross-checking of measurements and quantities against BoQs and drawings to prepare precise, competitive bids
• Integration with BIM platforms and project scheduling tools (e.g., Primavera, MS Project)
• Centralized procurement and inventory management for lean operations
• Streamlined subcontractor and workforce management with better accountability
• Scalability for large, multi-project, multi-company operations

How to choose the best construction ERP?

The best construction ERP is one that is purpose-built for the construction industry, integrates seamlessly with existing systems like Oracle Primavera and BIM, and supports multi-company, multi-project, and multi-currency operations. It should offer flexible deployment options—both cloud and on-premises—to fit business needs, while ensuring fast implementation and a short time-to-market.

Why do construction companies choose ProjectVIEW ERP?

ProjectVIEW ERP is designed for project-based companies. It covers the full business process from office to site, runs standalone or next to SAP S/4HANA and Oracle Fusion, and connects BoQ ↔ WBS ↔ Cost Codes for cost and time control. It is used by TERNA.

Search or Ask AI