Danaos

Structural Steel and Heavy Fabrication

ERP Software for Structural Steel and Heavy Fabrication Contractors

Structural steel and heavy fabrication projects combine engineering-led detailing, high-tonnage material management, complex shop workflows, heavy lifting and erection sequencing, and strict quality and safety requirements tied to project delivery milestones.

ProjectVIEW ERP supports structural steel and heavy fabrication contractors by integrating estimating, material take-off and procurement, shop and site labour productivity, fabrication and erection progress tracking, change control, and project-based financial management into a single enterprise platform, delivering real-time commercial visibility across tonnage-driven, schedule-critical steel construction programs.

Structural Steel & Heavy Fabrication
Manufacturing

How ProjectVIEW ERP Applies to Structural Steel & Heavy Fabrication

Workflow

Managing Project-Driven Fabrication Workflows

Structural steel fabrication is executed against project-specific drawings, BoQs, and delivery milestones. Fabrication activities—cutting, welding, assembly, surface treatment, and dispatch—must be tightly coordinated to meet construction sequencing requirements.

ProjectVIEW ERP enables fabricators to structure costs, work packages, and production stages by project, fabrication lot, and delivery phase, maintaining commercial control across the full fabrication lifecycle.

Example:
Track costs and progress separately for fabrication, surface treatment, and delivery batches while maintaining consolidated visibility at project level.

Manufacturing

Controlling Material Consumption and Yield

Steel plates, sections, and coils represent the largest cost component in structural fabrication. Poor control of cutting plans, scrap, rework, or overconsumption directly impacts margins.

ProjectVIEW ERP links material procurement, issue, and consumption to specific projects and fabrication work packages, ensuring material usage reflects true progress and cost.

Example:
Identify material overconsumption on specific fabrication lots and investigate cutting or rework inefficiencies before margins are eroded.

Manufacturing

Managing Subcontracted and Outsourced Processes

Heavy fabrication often relies on subcontracted processes such as galvanizing, coating, machining, or specialist welding. Delays or cost overruns in outsourced activities disrupt fabrication flow and delivery schedules.

ProjectVIEW ERP provides visibility into subcontract commitments, progress, and costs, ensuring outsourced processes remain commercially controlled.

Example:
Track costs and turnaround times for outsourced galvanizing works and assess their impact on delivery commitments.

Manufacturing

Controlling Change, Rework, and Design Revisions

Design changes, shop drawing revisions, and client-driven modifications are common in project-based steel fabrication. Without structured change control, rework costs accumulate silently.

ProjectVIEW ERP enables structured tracking of changes and rework costs, ensuring fabrication-driven variations are visible and commercially recoverable.

Example:
Assess the cost impact of revised connection details or member sizes before executing rework on fabricated components.

Manufacturing

Aligning Fabrication Output with Site Delivery Requirements

Structural steel fabrication must align precisely with site erection sequences. Premature fabrication or delayed delivery leads to storage costs, handling risks, and cash flow issues.

ProjectVIEW ERP links fabrication progress with delivery schedules and commercial milestones, ensuring production aligns with downstream construction needs.

Example:
Monitor fabrication readiness against site erection schedules to prevent premature production or delayed dispatch.

Search or Ask AI