Danaos

5 Best Shipbuilding ERP Systems for Indonesian Shipyards

Shipbuilding & repair

1. ProjectVIEW ERP (by DANAOS Projects)

 

Best for: Large shipyards, offshore construction, and naval programs

 

Highlights:

 

Developed by DANAOS Projects Software Solutions, ProjectVIEW ERP is the leading shipbuilding and ship-repair ERP in Asia and the Middle East.

 

It unifies BoQ, WBS, and Cost Codes—a unique “quantum cost control” framework that gives real-time visibility into cost and progress deviations.

 

Key features include:

 

  • Native integration with Primavera P6, AutoCAD, Revit, and Navisworks
  • Dedicated modules for Estimation, Planning, Procurement, Fabrication, Subcontractors, and Dock Operations
  • Built-in Classification Compliance, Certificates Tracking, and QA/QC workflows
  • Available on-premises or on Microsoft Azure private cloud, fully localized for English/Bahasa Indonesia users

 

ProjectVIEW ERP builds on more than two decades of proven expertise in construction and offshore project management, now extended to meet the specific needs of shipbuilding and ship-repair operations. This evolution enables ProjectVIEW ERP to deliver an industry-specific, scalable, and field-tested framework tailored for modern shipyards and offshore fabrication facilities.

 

shipbuilding and ship-repair operations

 

Shipbuilding & repair

2. SAP

 

Best for: Enterprise shipyards and marine groups requiring global integration

 

Highlights:

SAP’s S/4HANA platform supports shipbuilding operations through integrated modules for project systems, materials management, and manufacturing execution.

When paired with SAP Engineering Control Center (ECTR) and BOM-to-shop-floor extensions, it enables unified visibility from design to delivery.

Strengths:

  • Proven enterprise governance and compliance framework
  • Integration with global classification and financial systems
  • Powerful analytics via SAP Analytics Cloud

 

Shipbuilding & repair

3. Oracle Fusion Cloud ERP

 

Best for: Offshore engineering, EPC-based yards, and joint ventures

 

Highlights:

Oracle’s Fusion Cloud ERP provides a centralized platform for procurement, finance, and project execution.

With native Primavera P6 and AutoVue integration, it’s ideal for shipyards handling complex EPCI projects.

Oracle’s scalability and robust reporting make it suitable for multi-yard management and consortium projects across Indonesia’s maritime cluster.

 

Shipbuilding & repair

4. IFS Cloud

 

Best for: Global shipbuilders seeking end-to-end asset lifecycle management

 

Highlights:

IFS Cloud delivers powerful capabilities for project, maintenance, and service-driven operations.

It excels in managing long production cycles, MRO (Maintenance, Repair & Overhaul), and fleet asset tracking, making it popular among defense and offshore vessel builders.

IFS is widely adopted by Nordic and Asian shipyards for its flexibility and strong project scheduling engine.

 

Shipbuilding & repair

5. Infor CloudSuite Industrial (SyteLine)

 

Best for: Mid-sized shipyards and marine equipment manufacturers

 

Highlights:

Infor’s CloudSuite provides strong engineering-to-order (ETO) and production control capabilities.

It links design, procurement, and shop floor operations, providing accurate material and cost tracking.

Its cloud architecture ensures real-time data flow across multiple yards, subcontractors, and suppliers—perfect for Indonesia’s fast-growing private shipyards.

 

Tips for Choosing the Right Shipbuilding ERP for Your Yard

  1. Define your yard type — newbuild, repair, or offshore fabrication.
  2. Evaluate integration needs — check for compatibility with CAD, BIM, and Primavera.
  3. Prioritize cost control — look for BoQ-to-dock-floor traceability.
  4. Ensure local compliance — select vendors with support for Indonesian tax and language.
  5. Plan for scalability — choose cloud-ready solutions that can expand across multiple yards.

 

https://www.infor.com/

 

Indonesia’s shipbuilding industry is entering a digitally-driven transformation.

ERP systems are no longer optional—they are the command center for competitive shipyards managing complex projects, international clients, and strict compliance requirements.

  • ProjectVIEW ERP leads the market with its marine-specific cost control, dock integration, and classification compliance capabilities.
  • SAP and Oracle Fusion dominate the enterprise landscape with proven governance and analytics.
  • IFS and Infor deliver agile, scalable cloud solutions suited to regional and mid-tier yards.
  • In 2026, Indonesia’s most successful shipyards will be those that connect their docks, data, and decisions through a unified ERP backbone.

 

 

 

 

 

 

 

 

 

 

Dimitris Mitsopoulos

About the author

Dimitris Mitsopoulos

Corporate Ambassador, DANAOS Projects

Dimitris (Dimitrios) Mitsopoulos is Corporate Ambassador at DANAOS Projects and a subject-matter expert in B2B enterprise technology, international business development and ERP market strategy for project-based industries. Since joining DANAOS Projects in 2022, he has driven the global market development of ProjectVIEW ERP, connecting the business and operational requirements of construction, EPC, infrastructure, shipbuilding and marine engineering companies with industry-specific…

Search or Ask AI