Skip to content
Danaos

Marine - Offshore Construction

We provide Cross-Industry Know-how (Construction and Maritime), bundling maritime-specific and construction-specific applications to address project-based operational challenges.

Our offering for the marine environment is an amalgamation of integrated Marine and Inland construction applications that address the challenges faced within the context of offshore wind and oil & gas operations such as: offshore platform transportation, installation and decommissioning, drilling, subsea inspection, repair, maintenance (IRM) and marine construction such as: coastal protection, dredging, port expansion, land reclamation and offshore/subsea pipelaying and cable laying projects.

Book a Demo

Take Control of your Marine Construction Project

ProjectVIEW ERP bundled with Maritime Applications constitutes an Integrated Marine Construction Management platform that provides synchronization of onshore, site and offshore activities, real-time monitoring and reporting of project progress and resources scheduling and optimization to reduce downtime and enhance efficiency.

  • Utilize vessels fleet based on the requirements of each project
  • Integrate Maritime PMS with onboard Supply and office Procurement
  • Integrate Crew management, Labor productivity and HRMS
  • Integration with Maritime Commercial and Operations Modules

Regulatory and Statutory Compliance

Maritime purpose-specific applications for Crew Management, ISM, Risk Management, Voyage Estimation, Fleet Management, integrated with ProjectVIEW ERP Construction-specific Modules handle complex operating and business structures assuring Compliance, Safety, Environmental Control and Project Management.

In adherence to IMO, SOLAS, MARPOL, and STCW regulations for operations in international waters, as well as guidelines from classification societies like Lloyd’s Register and DNV, our Solution ensures strict vessel compliance based on each construction project’s jurisdiction.

Why ProjectVIEW ERP is Ideal for Marine and Offshore Contractors?

Cross-Industry Expertise

Seamless integration between the Marine, Maritime, and Construction domains, while understanding their operational challenges in harsh environments

Fleet and Equipment Management

Optimizing fleet management, tracking both owned and hired vessels. Streamlining equipment scheduling and procurement, reducing downtime and ensuring availability for offshore operations, facilitating vessel shortage and equipment deficiency

Office2Vessel and Office2Site Interconnectivity

Ensuring data integrity operating online and offline along with data optimization and communication between vessels, offices, providing real-time insights for decision-making while maintaining robust cybersecurity for sensitive information.

Resource and Material Use That Reflect True Cost and Progress

  • Site Item Request (SIR)
  • Examine Materials Production/Availability
  • Track Materials per Location
  • Monitor Production/Fabrication
  • Inventory Management – Store Issue Voucher (SIV)
  • Materials Allocations/Approvals
  • Machineries Maintenance – Garage
  • Vessels’ Drydocking
  • Machineries – Assets – Tools Planning
  • Machineries – Operators Requests
  • Fleet Management
  • Tools and Fittings Requests
  • Labor Planning and levelling
  • Biometrics integration (In/Out)
  • Labor Work Orders / Timekeeping
  • Employee Daily Transactions – Payroll
  • Subcontractor packages
  • Subcontractors Progress inspection
  • Monitor Subcontractoes Resources
  • Deductions/Retentions
  • New BoQ/WBS
  • Connected Documents/Dwgs
  • Claims / Variations
  • Daily Site Progress (% or Qty )/BoQ/WBS
  • Request for inspection (RFI)
01 02 03 04 05 06
Calendar