Our Software
Technologies
We are using Microsoft leading development technologies to built and customize our web and windows desktop applications
Methodologies
We design, structure, develop and maintain our applications based on the principles of fault tolerance and data integrity
Upgrades
With the addition of new features and functionalities we upgrade the software version. ProjectVIEW ERP is currently on v.10 (May’ 19)
Releases
Software updates follow operating system, browsers, database updates as well as bug-fixes (patches), released every 2-3 months
Our Software in Numbers
Our Tech Stack
We are coding in .NET framework, Java and Javascript
DevExpress, Infragistics and Visual Studio IDE for development
We built, test and deploy our apps in MS Azure using the latest technology
Git repositories and Azure DevOps for version control and Trello for collaboration
We use QlikSense (OEM) as our Business Analytics tool
We use DANAOS Inf@GATE for Mail and Document Mgt.
“Imagination is more important than knowledge. For knowledge is limited, whereas Imagination embraces the entire world, stimulating progress, giving birth to revolution”
–Albert Einstein

Fault Tolerant & Resilient Architecture
Our recommended systems architecture is consisted of tree -3- entities and is utilizing MS Azure latest technologies. It is designed to ensure that your committed data is never lost!

[ 1 ] HQ Office
ProjectVIEW ERP application is hosted on Premise on a Windows Application Server utilizing MSFT SQL Server database
[ 2 ] VPN Connectivity
Using VPN technologies, site office(s) can be securely connected to the HQ via broadband connectivity, interacting with the same database
[ 3 ] MS Azure Cloud
Utilizing the MSFT Azure technologies we offer both a Disaster Recovery (DR) and/or Fault Tolerant architecture and web access to site/extranet users
ProjectVIEW ERP Integration – API
ProjectVIEW ERP has a Web API, which can be used in various scenarios and is configurable at will.
It can be hosted remotely on Cloud or on premises. It provides access to needed data, and can also implement actions at ProjectVIEW’s database.
It includes token-based authentication – authorization. It can be used in SAP to access or input data.
We are using the Prince 2 Methodology as the de facto standard for Project Management
We utilize Projects in Controlled Environments (Prince 2), the most widely used Project Management methodology to all of our Projects. Prince 2 is a process-based approach that focuses on Organization and Control over the entire Project from start-to-finish
Upgrades & Updates
software upgrades
New functional enhancements and extensions, major improvements in terms of UI/UX and new APIs/SKDs that constitute a new software version number. New versions are released approximately once a year.
minor releases & updates
Maintenance releases and bug fixes mainly due to COTS (such as: OS and database) upgrades and updates. Releases are available to download on-demand subject to user (admin) acceptance 3-4 times per year.
Recommended Configuration
Server (est. 10 concurrent users)
- XEON E5
- At least 6 CORES
- RAM: 64 GB
- HD1: 1 x 1TB SSD
- HD2: 2 x 512 GB SSD
- Windows Server 2019, or later
- SQL Server 2019 Std. Edition, or later
Workstations
- RAM: 8 GB
- HD: SSD
- Windows 10 home, or better
