Skip to content
Danaos

Construction

Over two decades ago, we envisioned a holistic software solution designed to unify, manage, and standardize every aspect of construction activities. That vision has materialized into ProjectVIEW ERP — the ultimate enterprise-ready, Integrated Cost Control and Project Performance Management Platform for the construction industry.

A Cloud-Based ERP that controls resources onsite and optimizes business processes in the office. ProjectVIEW ERP delivers a comprehensive, integrated suite of modules for Commercial, Operational, and Financial management ideal for both Vertical and Horizontal Construction.

Book a Demo

Take Control of your Construction Projects

ProjectVIEW ERP is designed to manage the complexities and risks of capital and mega projects, including transportation works, large-scale MEP installations, data center construction, building projects, reclamation projects, and real estate developments—all under EPC, PPP, and turnkey contracts.

It empowers Contractors, Concessionaires, Owners, Developers, Engineering Consultants and Independent Engineers to:

  • Gain Real-Time Awareness of project status and financial performance.
  • Streamline Fixed-Price/LS Contracting to mitigate overruns.
  • Expand Project Pipelines with agile tools and data-driven insights.
  • Demarcate Uncertainty, Size Risks, and Secure Profits through precise forecasting and cost control

Business Suite for Lean Construction

Unlike basic scheduling software, ProjectVIEW ERP is a fully unified Construction Operating System (Construction_OS). It is designed to assist contractors in every phase of the construction lifecycle, from Estimation and Bidding to Procuring and Operating On-Site.

It comprises a constellation of 10+1 modules that comprehensively address Commercial, Operational, and Financial processes, positioning construction and project-based manufacturing in the AI-driven landscape by providing structured data, standardized processes, and serving as a central hub for Project Performance Management. A digital transformation -intelligent- platform that drives sustainability and Empowers Contractors to Build a Better World!

Say goodbye to legacy ‘spaghetti systems’ and spreadsheet chaos. ProjectVIEW ERP integrates seamlessly with Oracle Primavera, MS Project, BIM systems, and more, enabling real-time [Actual vs Budgeted Cost] realistic comparison.

Why ProjectVIEW ERP is ideal for Contractors?

Short Time-toMarket

Out-of-the-box ready to be launched on-Cloud or on-Premise in average within 7 months, integrated with all your business features

Construction-specific

Site applications operating both online and offline, capturing site data and controlling daily progress against materials consumption, labor productivity, and machinery utilization

Trilateral Connectivity

Associating all business processes with the Trilateral Connectivity between BoQ ↔ WBS ↔ Cost Codes

ESG Compliance

ProjectVIEW ERP provides a robust platform for meeting Environmental, Social, and Governance (ESG) requirements.

BIM-Driven Efficiency

Seamless integration with BIM and WBS software facilitates realistic results on digital twins while streamlining the traditionally cumbersome procurement and supply processes in MEP and data center construction

Resource and Material Use That Reflect True Cost and Progress

  • Site Item Request (SIR)
  • Examine Materials Production/Availability
  • Track Materials per Location
  • Monitor Production/Fabrication
  • Inventory Management – Store Issue Voucher (SIV)
  • Materials Allocations/Approvals
  • Machineries Maintenance – Garage
  • Machineries – Assets – Tools Planning
  • Machineries – Operators Requests
  • Tools and Fittings Requests
  • Labor Planning and levelling
  • Biometrics integration (In/Out)
  • Labor Work Orders / Timekeeping
  • Employee Daily Transactions – Payroll
  • Subcontractor packages
  • Subcontractors Progress inspection
  • Monitor Subcontractoes Resources
  • Deductions/Retentions
  • New BoQ/WBS
  • Connected Documents/Dwgs
  • Daily Site Progress (% or Qty )/BoQ/WBS
  • Request for inspection (RFI)
01 02 03 04 05 06
Calendar