Skip to content
Danaos

Greener Geomaterials for Cost-Efficiency and Sustainability

About Geomaterials

Geomaterials are structural elements that are used in construction, meaning that their mechanical characteristics (elasticity, tensile strength, elongation, hardness and fatigue limit) either as end-products (manufactured from earth materials) or as extracted materials, mined directly from the earth, are ideal for building structures.

Read More on MEDIUM

Calendar