CSI Crosswalk API
CSI Institute Masterformat – Uniformat
For Project Budgeting, Cost Estimation and Cost Control the proper categorization of all direct Resources: Materials, Labor, Machinery and Subcontractors is absolutely imperative. Based on CSI Masteformat and Uniformat, DANAOS Projects assists clients to validate data input and maintain processes integrity by providing the Coding Guidelines for all Resources.
Uniformat and Masterformat Associations
ProjectVIEW ERP Cost Sheets: Cost Recipes, Productivity Templates, are composed by DANAOS Construction Consultants Team based on international conventions of ‘Method of Working’ and ‘Manner of Operating’ assemblies of Resources per Cost Recipe. The Resources are properly categorized based on CSI Masterformat 2018 Coding and are further associated to Cost Recipes based on CSI Uniformat Codes.
Accelerate Bids and Bang-On Estimations
Utilizing ProjectVIEW ERP Cost Sheets/Productivity Templates, our Clients can quickly apply specific predefined Cost Recipes on their BoQs and can dramatically accelerate the Budgeting process. Further on, estimators and tendering professionals can get a prepopulated list of Resources for each BoQ where can adjust and optimize, accordingly. Each new Cost Sheet generated from a new/updated assembly of Resources can be saved as a a new Cost Recipe version.
